§ 260-68.1
Temporary fencing
[Added 4-7-2008 by Ch. No. 1633]
Temporary fencing, as required by the Planning Board during the construction process, shall be as follows:
- A. On sites that have slopes of 10% or less; temporary poly barrier fencing, snow fencing, or any other flexible fencing a minimum of four feet in height, with supports equal to the height of the fencing and placed no more than four feet apart, shall be installed on the up-gradient side of the slope.
- B. On sites that have slopes greater than 10%, temporary stockade or chain link fencing a minimum of six feet in height, with supports equal to the height of the fencing and placed no more than 10 feet apart, shall be installed on the up-gradient side of the slope.
- C. Supports for temporary fencing shall not be set in concrete.
- D. Temporary fencing shall be inspected daily and maintained by the property owner or its agent.