City of Newport
§ 17.107.020

Intent and purposes

A temporary use permit allows for the short-term use and/or placement of structures on a lot which duration is longer than two weeks, but not longer than six months. The temporary use permit regulates temporary uses that occur entirely on and within a lot. Temporary uses located within the public right-of-way are regulated separately.

(Ord. No. 2025-30, § 1, 4-9-2025)