§ 604
Sign Permit Required
604. Sign Permit Required A sign permit shall be obtained from the Building Official for all signs under Article VI-603 (E), (F)(1), (3) and (4) above.
604. Sign Permit Required A sign permit shall be obtained from the Building Official for all signs under Article VI-603 (E), (F)(1), (3) and (4) above.